Chart boundary

Does not replace the bender manual, bend-limit rules, raceway product data, or field measurement.

field mark diagram

Bender mark and saddle sequence

The diagram shows where field marks belong; calculators still handle arithmetic.

Scoperaceway and field layoutX-axisconduit mark sequenceY-axisfield lookupReviewAnnualNextConduit bend layout calculator
Bender mark and saddle sequence11Stub-upStub-uptake-uptake-up22OffsetOffsetspacing + shrinkspacing + shrink33SaddleSaddle3-point / 4-point3-point /4-point
The diagram shows where field marks belong; calculators still handle arithmetic.
Start lookupfield measurement

Measure from a fixed end or obstruction.

Bender markarrow / star / notch

Tool manual defines the mark.

Mark spacingoffset or saddle multiplier

Calculator/table owns the arithmetic.

Shrink directiontoward obstruction

Transfer marks consistently before bending.

Decision table

Show the field layout relationship among bender marks, offsets, shrink, and saddle sequencing.

Scroll sideways to keep row labels aligned with hidden columns.

Basis: Klein conduit bender guide, Greenlee bending manuals, and field conduit bending source links.
MethodBest fitWatch pointHandoff
Stub-upSingle 90 degree bend with take-upBender take-up variesBender guide
Offset bendParallel shift around surface or obstructionShrink and spacingConduit bend calculator
Three-point saddleSmall obstruction centered under runMiddle bend orientationSaddle multiplier table
Four-point saddleWider obstruction clearanceTotal bend count and pull planCable pulling review
Notes
  • Treat this chart as a planning and conversation aid only.
  • Confirm current utility requirements, product markings, manufacturer instructions, and local authority requirements before field work.
  • Use the linked calculator or table when the task needs project-specific arithmetic.

Source links

Open the underlying public sources before treating the chart as project guidance.