Chart
Major home load triage map
Map the first service and panel checks before adding EV charging, heat pump equipment, hot tubs, suites, or other major dwelling loads.
Does not approve a branch circuit, service size, panel capacity, permit, or inspection result.
decision flow
Major load triage
The map is a routing layer: use it to decide which calculation, table, or guide to open next.
- 1Proposed load typeEV / heat pump / hot tub / suite
The load family decides the next source.
- 2Nameplate datakW, MCA/MOCP, amps
Known equipment data beats assumptions.
- 3Service size100 A / 125 A / 200 A
Service rating is only the starting boundary.
- 4Capacity bandspare / tight / unknown
Choose calculator or professional review accordingly.
- 5Panel spacesspace is not capacity
Physical breaker spaces and load capacity are separate.
Route charger projects to EVSE current, overnight recovery, and load-management review.
Separate compressor MCA/MOCP from resistance backup heat before service screening.
Use nameplate and the load-list calculator before treating the panel as available.
When service size, load data, or authority path is unclear, pause for qualified review.
Decision reference
Show the visual triage path for deciding which calculator, table, or guide to open before adding a major load.
| Condition | Chart reading | Next check | Boundary |
|---|---|---|---|
| EV charger added | Compare current setting and EVEMS path | EV panel decision chart | No EVSE approval |
| Heat pump or backup heat | Separate compressor load from resistance heat | Backup heat impact chart | No HVAC approval |
| Suite or large appliance | Demand and known-load rules may matter | Residential load table | No permit decision |
| Panel physically full | Spaces and capacity are different questions | Loadcentre references | No panel modification approval |
Use notes
- Use this chart as a planning and conversation aid only.
- Confirm current utility requirements, product markings, manufacturer instructions, and local authority requirements before field work.
- Use the linked calculator or table when the task needs project-specific arithmetic.
Reference sources
Open the underlying public references before treating the chart as project guidance.