Reference boundary

Public cost reference only. Roof condition, equipment class, labour market, permits, and incentives change installed cost materially.

Reference table

Compare representative installed solar cost-per-watt ranges for Canadian projects.

Cost reference only; values are representative public summaries and do not account for incentives, permits, or site-specific quotes.
System size (kW)Installed low (CAD/W)Installed high (CAD/W)Source periodBoundary
42.73.6public cost summaries, 2026 reviewCost reference only; roof work, electrical upgrades, permits, incentives, and installer quote govern actual price
62.53.4public cost summaries, 2026 reviewCost reference only; roof work, electrical upgrades, permits, incentives, and installer quote govern actual price
82.43.2public cost summaries, 2026 reviewCost reference only; roof work, electrical upgrades, permits, incentives, and installer quote govern actual price
102.33.1public cost summaries, 2026 reviewCost reference only; roof work, electrical upgrades, permits, incentives, and installer quote govern actual price
152.23public cost summaries, 2026 reviewCost reference only; roof work, electrical upgrades, permits, incentives, and installer quote govern actual price
Use notes
  • Use this table for preliminary reference and arithmetic checks only.
  • Confirm equipment ratings, product markings, installation conditions, utility requirements, and the local authority requirements before design or field use.