Scope

Ontario residential source-navigation only. It does not publish demonstrated-load procedure, qualification criteria, service decisions, or design acceptance.

Lookup table

Point to official Ontario source pages relevant to existing-dwelling demonstrated-load review.

Scroll sideways to keep row labels aligned with hidden columns.

Lookup basis uses ESA Bulletin 8-3-16, the ESA Ontario Electrical Safety Code page, and CSA Canadian Electrical Code product navigation.
Source areaCurrent sourceReview stepBoundary
ESA Bulletin 8-3-16Maximum circuit loading and demand factorsReview the demonstrated-load source before reviewing existing-dwelling load context.source-navigation only; no demonstrated-load procedure, qualification criterion, service decision, or calculation value is reproduced
ESA OESCOntario Electrical Safety Code pageOpen this page to confirm the current Ontario code cycle before opening dwelling-load bulletins.source-navigation only; no demonstrated-load procedure, Ontario rule text, amendment, or acceptance answer is reproduced
CSA CEC productsCanadian Electrical Code products pageOpen this public product page to identify the national source owner and current product path.source-navigation only; no demonstrated-load procedure, licensed standard text, or service-sizing answer is reproduced
Notes
  • Check table values only for source-navigation and current source-area review.
  • Confirm the current source document, product marking, utility page, or authority guidance before any design or field decision.