Chart boundary

Does not diagnose a site event, prove equipment tolerance, set utility obligations, or replace power-quality monitoring.

itic envelope

Duration and voltage magnitude zones

A short deep sag and a long shallow sag can have different equipment effects; the two axes must be read together.

Scopepower qualityX-axisevent durationY-axisvoltage percent of nominalReviewAnnualNextVoltage imbalance percent calculator
Duration and voltage magnitude zonesevent durationvoltage percent of nominalInterruptiondeep low-voltage eventSagbelow nominalNo-interruption bandreference envelopeSwellabove nominal
A short deep sag and a long shallow sag can have different equipment effects; the two axes must be read together.
Duration and voltage magnitude zonessag / interruptionno-interruption bandswell zoneevent durationvoltage percent of nominal
Interruptiondeep low-voltage event

Can reset controls or electronics.

Sagbelow nominal

Duration and magnitude must be read together.

No-interruption bandreference envelope

Not proof of equipment tolerance.

Swellabove nominal

Overvoltage stress depends on duration.

Decision reference

Show how event duration and voltage magnitude combine to create power-quality risk zones for Canadian users reviewing sag and swell records.

Reference basis: ITIC curve explainers, Canadian utility sag/swell definitions, and power meter documentation that records sag/swell events against ITIC-style limits.
Curve bandWhat it showsRisk cueHandoff
Interruption zoneVery low voltage eventDropout or resetPower-quality monitor data
Sag zoneReduced voltage for a durationMotor contactor or drive tripEquipment ride-through review
No-interruption bandTypically tolerated areaEquipment-specific exceptionsManufacturer data
Swell zoneElevated voltage eventOvervoltage stressUtility/power-quality review

Use notes

  • Use this chart as a planning and conversation aid only.
  • Confirm current utility requirements, product markings, manufacturer instructions, and local authority requirements before field work.
  • Use the linked calculator or table when the task needs project-specific arithmetic.

Reference sources

Open the underlying public references before treating the chart as project guidance.